Modernization Hub

Dequeue

Enhanced Definition

Dequeue, in the mainframe context, refers to the act of removing an item from a queue or releasing a previously acquired serially reusable resource. It is the counterpart to "enqueue" and is fundamental for resource management, inter-program communication, and job processing within z/OS and its subsystems. Dequeue, in the context of z/OS and mainframe systems, refers to the act of releasing a previously acquired resource or removing an item from a queue for processing. It is the counterpart to `ENQ` (Enqueue), which acquires or places an item onto a queue. This operation is fundamental for resource management, serialization, and message processing in a multi-tasking, shared-resource environment.

Key Characteristics

    • Resource Release: For serially reusable resources (e.g., datasets, control blocks), DEQ is the system service used to release a resource that was previously acquired via an ENQ (Enqueue) request.
    • Serialization Management: It plays a crucial role in managing access to shared resources, ensuring that once a task or address space finishes using a resource, it becomes available for others.
    • Queue Processing: In message queuing systems like IBM MQ or IMS Transaction Manager, dequeuing involves retrieving a message from a queue for processing by an application.
    • Operating System Service: The core DEQ function for resource serialization is typically invoked via a z/OS Supervisor Call (SVC) instruction, often through assembler macros or higher-level language interfaces.
    • Scope Specification: When releasing resources, the DEQ request specifies the scope (e.g., SYSTEM, SYSTEMS, JOB, STEP) to define how broadly the resource is released and for which entities it becomes available.
    • Implicit vs. Explicit: Resources can be explicitly DEQued by an application, or implicitly DEQued by the system (e.g., at job or step termination) if not explicitly released.

Use Cases

    • Dataset Access Control: After a COBOL batch program finishes updating a VSAM or sequential dataset, it performs a DEQ operation to release the exclusive lock on that dataset, allowing other programs to access or update it.
    • Message Retrieval in MQ: A CICS transaction or a batch application uses an MQGET call (which is a dequeue operation) to retrieve a message from an IBM MQ queue for processing, such as fulfilling an order or updating a database.
    • IMS Transaction Input: An IMS application program uses a GU (Get Unique) call to dequeue the next input message from its assigned message queue, initiating the processing of a transaction.
    • Application-Specific Resource Release: A critical application component might ENQ a custom control block in shared memory to serialize access to a specific data structure; once processing is complete, it DEQs the control block.
    • Job Resource Clean-up: Upon successful or unsuccessful completion of a batch job, the Job Entry Subsystem (JES2/JES3) implicitly DEQs any system resources (e.g., datasets, devices) that were exclusively held by that job.

Related Concepts

DEQ is intrinsically linked to ENQ (Enqueue), forming the fundamental pair for resource serialization in z/OS, where ENQ acquires a resource and DEQ releases it. It is a core component of Global Resource Serialization (GRS), which manages ENQ/DEQ requests across multiple z/OS systems in a sysplex. In message queuing systems like IBM MQ and IMS, dequeue operations are essential for asynchronous communication, workload balancing, and ensuring messages are processed once and only once.

Best Practices:
  • Pair ENQ with DEQ: Always ensure that every ENQ request has a corresponding DEQ request to prevent resource deadlocks, resource starvation, or system hangs.
  • DEQ Promptly: Release resources as soon as they are no longer needed to maximize concurrency, improve system throughput, and reduce potential contention.
  • Handle Abnormal Termination: Implement DEQ logic within recovery routines (e.g., ESTAE/ESTAI exits) to guarantee that resources are released even if a program terminates abnormally (abends).
  • Specify Correct Scope: Use the appropriate DEQ scope (e.g., SYSTEM for system-wide resources, JOB for resources local to a job) to avoid premature release or unintended resource contention.
  • Monitor Contention: Regularly monitor ENQ contention using tools like RMF or GPR displays to identify bottlenecks caused by prolonged resource holding or missing DEQ operations.

Related Vendors

MacKinney Systems

54 products

UNICOM Systems

35 products

IBM

646 products

Trax Softworks

3 products

Related Categories

email

33 products

CICS

214 products

Tools and Utilities

519 products

Administration

395 products

Security

144 products